প্রশ্ন 1 এর 8

How are blue and green environments assigned during a release?

প্রতিটি প্রশ্নের পূর্বরূপ দেখুন8 প্রশ্ন

আপনি কুইজ নেওয়ার সাথে সাথে উত্তর এবং ব্যাখ্যাগুলি উপস্থিত হয়।

  1. How are blue and green environments assigned during a release?
    • One serves current traffic while the other stages a candidate release
    • They store separate training and test labels
    • They run different model classes permanently
    • They split the GPU into two hardware drivers
  2. What enables a fast routing rollback after a bad cutover?
    • The new model is retrained during every request
    • The previous environment remains available and healthy
    • The database schema is deleted
    • The old artifact was overwritten
  3. Why plan capacity for blue and green simultaneously?
    • The model runs on both environments after cleanup forever
    • Traffic is always doubled by the router
    • Both production-like environments may need resources during rollout
    • Blue-green requires two datasets
  4. Why should database changes remain compatible with both versions during cutover?
    • Green must rewrite blue's weights
    • The router changes database columns automatically
    • ML models do not read data schemas
    • A rollback may return traffic to the older application or model
  5. What does shadow traffic provide?
    • An automatic full production switch
    • Candidate predictions for comparison without serving them to users
    • A guarantee of zero latency
    • A replacement for model evaluation data
  6. What does routing rollback not necessarily undo?
    • The router's traffic target
    • Which environment receives future requests
    • External side effects or writes already made
    • The old environment's availability
  7. How does a canary relate to the basic blue-green cutover?
    • It only validates container image signatures
    • It is another name for two environments with no traffic shift
    • It eliminates the need for a green environment
    • It can expose a small traffic fraction before the full switch
  8. Why warm a large model in the green environment before switching?
    • It can reduce initialization delay and accelerator allocation surprises
    • It guarantees output quality
    • It eliminates the old environment's costs
    • It validates every subgroup metric