Ikibazo gihuza ibibazo · Biragoye Urwego

Ikibazo cyo Gukurikirana Icyitegererezo

Ikizamini cyerekana ibimenyetso, ibirango byatinze, ibimenyetso byitsinda, bitera kwisuzumisha, nyirubwite, guhitamo gukira, no kugenzura kugenzura.

Inzira zijyanye no kuyoboraGukurikirana Icyitegererezo cya AI
Ikibazo 1 Bya 8

Ikiranga kwinjiza gukwirakwiza nyuma yibicuruzwa bihindutse. Ibi bishimangira iki?

Reba buri kibazo8 ibibazo

Ibisubizo nibisobanuro bigaragara mugihe ufata ikibazo.

  1. Ikiranga kwinjiza gukwirakwiza nyuma yibicuruzwa bihindutse. Ibi bishimangira iki?
    • That the model must be retrained immediately
    • That the new data are invalid
    • A reason to investigate, not automatic proof that accuracy declined
    • That task quality improved
  2. Kuberiki ukurikirana imirima yabuze hamwe nintera itemewe mbere yuko ibirango bivamo bigera?
    • They measure accuracy directly
    • They replace delayed outcome evaluation
    • They prove the model is biased
    • They can expose pipeline problems before predictive quality can be measured
  3. Ibipimo bya drift bitemewe. Ni iki kigikenewe kugirango dushyireho imikorere?
    • Reliable outcome-based evaluation
    • A larger dashboard
    • A second drift metric
    • A new prompt template
  4. Kuki ugenzura gutinda gukusanya ibirango no guhitamo?
    • Labels always arrive immediately
    • Delayed or selective labels can make performance evidence look more complete than it is
    • Only model outputs need versioning
    • A delayed label is automatically a bad outcome
  5. Ibisobanuro biranga byahinduwe kandi ibyitegererezo byinjira byahinduwe. Ni iki kigomba kubaho mbere yo kongera imyitozo?
    • Assume all drift requires retraining
    • Ignore the shift if latency is stable
    • Investigate the cause and determine whether the shift is a data or software defect
    • Change the alert threshold until it disappears
  6. What should a monitoring alert process specify?
    • Only a chart color
    • The model’s preferred action
    • A guarantee that drift will not occur
    • Thresholds, review ownership, and the recovery decision
  7. After retraining, how should the intervention be checked?
    • Evaluate on appropriate material and continue measuring afterward
    • Compare only training accuracy
    • Assume retraining fixed the cause
    • Stop monitoring the old and new versions
  8. Why include subgroup results and sample sizes in monitoring reports?
    • Averages already provide complete subgroup information
    • They show which populations the reported performance actually covers
    • Sample sizes never affect interpretation
    • Subgroups can be inferred from the model score