Ikibazo gihuza ibibazo · Hagati Urwego

Kugenda-Imbere Kwemeza Igihe Cyibibazo

Ikizamini cyo guhanura inkomoko, kuzunguruka no kwagura Windows, hamwe nigihe cyo gutemba mugihe nyacyo cyo kugenda-imbere no gusuzuma ibikorwa.

Ikibazo 1 Bya 8

Icyitegererezo cy'ukwezi gihugura kugeza muri Kamena kandi giteganijwe muri Nyakanga. Mu kwagura-idirishya ryisuzuma, ni ayahe mateka akoreshwa mubiteganijwe gutaha kwa Kanama?

Reba buri kibazo8 ibibazo

Ibisubizo nibisobanuro bigaragara mugihe ufata ikibazo.

  1. Icyitegererezo cy'ukwezi gihugura kugeza muri Kamena kandi giteganijwe muri Nyakanga. Mu kwagura-idirishya ryisuzuma, ni ayahe mateka akoreshwa mubiteganijwe gutaha kwa Kanama?
    • August outcomes combined with January through June
    • July alone, discarding all earlier months
    • January through July
    • January through June with months randomly reordered
  2. Ni irihe tandukaniro ritandukanya idirishya ryamahugurwa azenguruka niyaguka?
    • A rolling window retains a recent span while an expanding window accumulates earlier history
    • A rolling window accumulates all earlier history while an expanding window retains a fixed recent span
    • Both windows retain every historical row; only their forecast horizons differ
    • The distinction depends only on how often predictions are issued
  3. Ubucuruzi bufata ibyemezo ibyumweru bine biri imbere. Kuki isuzuma ryumunsi ukurikira ryonyine ridahagije?
    • Next-day error can be multiplied by 28 to determine four-week-ahead error
    • Strong next-day performance guarantees the same ranking of models at four weeks
    • The training-window length alone determines which horizon has been evaluated
    • The evaluated horizon does not match the actual decision
  4. Ikiranga impuzandengo yo kugurisha kumunsi umwe ibicuruzwa byateganijwe. Ni ikihe gikosora gikemura ibibazo bitaziguye?
    • Include the next day's sales in the average as well
    • Shift the history so the target day's outcome is excluded
    • Fit a larger model to the unshifted feature
    • Randomize the order of the evaluation dates
  5. Ni ukubera iki amateka yo hanze yakagombye kwerekana gutinda no gusubirwamo mugihe cyateganijwe?
    • Published revisions may be used whenever they are more accurate
    • A feature is safe whenever its observation date precedes the target, regardless of publication date
    • Later information may not have been available at the forecast origin
    • A time-ordered splitter automatically reconstructs historical releases
  6. What additional check is needed even after using an ordered splitter such as TimeSeriesSplit?
    • Verify that feature preparation did not use future information
    • Assume every preprocessing operation is automatically safe
    • Use the whole dataset to calculate all target averages
    • Replace the forecast horizon with a random split
  7. Overlapping evaluation horizons produce several forecasts for the same outcome. What should the report specify?
    • That every forecast of the same target should be counted as an independent outcome
    • That only the forecast with the smallest realized error is retained
    • That forecast origins can be discarded once the target date is known
    • Whether scoring is by forecast opportunity or aggregated by target time
  8. Which data condition requires extra care when using TimeSeriesSplit to compare equal-duration test folds?
    • Observations arrive on a fixed daily schedule
    • Observations are irregularly spaced in time
    • Each fold contains the same fixed number of regularly spaced observations
    • The training window expands across successive folds