Statistical Process Control Charts Quiz

Tests Shewhart, CUSUM and EWMA signals, control versus specification limits, stable baselines, small shifts, investigation, and ML monitoring gaps.

Laluan panduan yang berkaitanStatistical Process Control Charts
soalan 1 daripada 8

What does a point beyond a control-chart limit establish by itself?

Pratonton setiap soalan8 soalan

Jawapan dan penjelasan muncul semasa anda mengambil kuiz.

  1. What does a point beyond a control-chart limit establish by itself?
    • The exact machine component that failed
    • Proof that the product violated every customer specification
    • A signal to investigate a departure from the modeled baseline, not its cause
    • A reason to recalculate limits immediately around the new point
  2. How do control limits differ from product specification limits?
    • They are always numerically equal when a process is stable
    • Control limits describe expected process variation under a baseline; specifications define acceptability
    • Control limits are legal quality standards set by the buyer
    • Specification limits are calculated only by an EWMA recursion
  3. Why can a small persistent mean shift escape a basic Shewhart chart for a while?
    • Shewhart charts remove all historic observations
    • A stable baseline prevents any change in the plotted process
    • The chart always uses a cumulative sum instead of individual points
    • Individual plotted statistics can remain inside limits despite repeated small departures
  4. What feature makes CUSUM useful for detecting sustained small changes?
    • It ignores every observation except the latest one
    • It accumulates departures from a target across successive observations
    • It automatically identifies the cause of drift
    • It guarantees no false alarms for a stable process
  5. In an EWMA chart, how are older measurements represented?
    • They receive diminishing weights through the recursive average
    • All older values receive the same weight as the newest value
    • They are deleted before each calculation
    • Only the oldest measurement is used as the baseline
  6. What should a team establish before interpreting an SPC signal?
    • A stable reference period, statistic, sampling plan and alert rule
    • Only the most recent outlying value
    • A new baseline recalculated after each alarm
    • A chart color scheme that labels all points acceptable
  7. A model's input-feature chart is stable, but outcome labels are not yet available. What remains unverified?
    • Whether the input pipeline returned any numbers
    • Whether a control chart has a center line
    • Whether the feature distribution stayed near the monitored baseline
    • Whether task performance on real outcomes changed
  8. After a documented, stable process redesign, how should old control limits be handled?
    • Move them automatically after every alarm
    • Treat them as permanent even when the process definition changed
    • Deliberately establish and document an appropriate new baseline
    • Discard all earlier monitoring records without an audit trail